Terms and Conditions

Terms and Conditions

Request a Quotation

Terms of sale hold their position because they avoid disputes between the parties. For goods supplied, the disputes are easy to predict: whether the quotation is still in force, whether the goods supplied are within the required tolerances, when the risk is transferred to the buyer, and what happens in the case of vagueness in the specification. The terms and conditions are below, together with the quality policy and the privacy policy. This document is drafted for Oman Piping Solution to review and adopt, and it is not legal advice; the bracketed items and the governing law need confirming with a qualified adviser before publication.

1. Website Use

The content of this site, including technical guides, reference tables and dimensional data, is provided for general information. Standards are revised, and where a figure matters to a design the governing document is the current edition of the standard itself, together with any operator or project specification that takes precedence over it. Nothing on this site is engineering advice for a specific application, and it does not replace verification by a competent engineer.

Site content is the property of Oman Piping Solution unless stated otherwise.

Terms FAQ

How long is a quotation valid?

For the period stated on the quotation. Prices reflect alloy surcharges, freight and exchange rates at the date of quotation and are confirmed at order.

Is material within tolerance conforming?

Yes. Dimensional and weight tolerances are those of the applicable standard, and material within tolerance conforms even where delivered weight differs from a calculated figure.

Can certification type be changed after order?

Not always. EN 10204 3.2 certification requires witnessed testing, so a change after production has begun may not be possible at any price.

How are substitutions handled?

As deviations offered for written approval with the difference stated. Nothing is supplied as a like-for-like equivalent without that approval.

When does risk pass?

As defined by the agreed Incoterm stated on the order, under the Incoterms rules edition referenced there.

What happens to claims on material that has been worked?

Material that has been cut, machined, welded or coated is taken as accepted, except for defects that could not reasonably have been identified beforehand.

Next Step

If your organisation has its own purchase conditions, send them with the enquiry rather than with the order. Reconciling two sets of terms before a quotation is issued is quicker than doing it after one has been accepted.

Request a Quotation