Pipe Dimensions: Reference Tables

Request a Quotation

Why the outside diameter does not change with schedule, why STD stops matching Schedule 40 above NPS 10, and why the S series is not the plain series is all explained in thepipe schedule, NPS and wall thickness guide. If you are here to look a number up rather than to work out which number you need, this pipe dimension chart is below. Ranges are underpipes and tubes.

NPS to DN and Outside Diameter

NPS

DN

OD, mm

OD, in

1/8

6

10.3

0.405

1/4

8

13.7

0.540

3/8

10

17.1

0.675

1/2

15

21.3

0.840

3/4

20

26.7

1.050

1

25

33.4

1.315

1 1/4

32

42.2

1.660

1 1/2

40

48.3

1.900

2

50

60.3

2.375

2 1/2

65

73.0

2.875

3

80

88.9

3.500

4

100

114.3

4.500

5

125

141.3

5.563

6

150

168.3

6.625

8

200

219.1

8.625

10

250

273.0

10.750

12

300

323.8

12.750

14

350

355.6

14.000

16

400

406.4

16.000

18

450

457.0

18.000

20

500

508.0

20.000

24

600

610.0

24.000

From NPS 14 upward the outside diameter equals the nominal size in inches. Below that it does not.

Related Calculations

Pipe Dimensions FAQ

Does the outside diameter change with schedule?

No. For a given NPS the outside diameter is fixed, so changing schedule changes the bore and the flow area.

Where does NPS stop differing from the inch size?

From NPS 14 upward the outside diameter equals the nominal size in inches. Below that it does not, so NPS 2 is 60.3 mm rather than 50.8 mm.

Is STD the same as Schedule 40 at NPS 16?

No. From NPS 12 upward STD is a constant 9.53 mm, against 12.70 mm for Sch 40 at NPS 16.

Do 40S and 80S always match Sch 40 and Sch 80?

No. The correspondence holds at smaller sizes and breaks from around NPS 10 upward, so the S series has to be read from its own table.

Why does bore matter when a schedule is substituted?

Because the bore is what a hydraulic calculation uses, so a schedule change alters the flow area even though everything still bolts together.

Where do fitting and flange dimensions come from?

Their own standards: ASME B16.9 for buttweld fittings, B16.11 for forged, B16.5 and B16.47 for flanges, and MSS SP-75 and SP-97 for items outside the ASME series.

Applying This to an Enquiry

When sending a line list, give the schedule for pipe and the schedule for the buttweld fittings separately. They are two line items describing one joint, and the wall mismatch between them is the most common dimensional error on a piping order.

Quotations are available in USD, OMR, AED, SAR, QAR, KWD and BHD, on EXW, FOB, CFR or CIF terms, with EN 10204 3.1 certificates as standard and 3.2 on request. Lead time is confirmed at quotation.

Request a Quotation