A piping line is never one purchase. These parts consist of pipe from a pipe mill, fittings produced at a fittings factory, flanges manufactured by a forge, as well as the plate and bar utilized for the manufacture of the vessels, mountings and machine details related to the assembly. Thispiping products range is organised in that order, because that is how a line list is built and how a material take-off is priced. Each section below leads to the grade pages under it.
Pipes and Tubes
Hub:pipes and tubes
|
Family |
Pages |
|---|---|
|
API line pipe and OCTG |
API 5L line pipe,sour service line pipe,API 5CT casing and tubing |
|
Carbon steel and mechanical |
|
|
Alloy and chrome moly |
|
|
Stainless |
Stainless steel,304 and 304L,316 and 316L,321 and 321H,310 and 310S,904L,254 SMO |
|
Duplex |
|
|
Nickel alloys |
Nickel alloy,Inconel 625,Incoloy 825,Monel 400,Hastelloy C276 |
|
Copper alloys and titanium |
|
|
Tube for equipment |
|
|
Clad and lined |
Product Range FAQ
What product categories are supplied?
Pipes and tubes, pipe fittings and flanges, plates and sheets, and round bars, with bolting and gaskets alongside them.
Which material families are covered?
Carbon and mechanical steel, alloy and chrome moly, stainless, duplex and super duplex, nickel alloys, copper nickel, titanium, and clad and lined construction.
How should a page be chosen if the grade is not fixed?
Use the selection guides rather than browsing grades. They work from service conditions, which is what actually decides the family.
Are bolting and gaskets part of the range?
Yes, and they are the items most often left off a line list, particularly on sour and low temperature service where they carry their own requirements.
What is needed to price a line list?
Specification and grade with class, dimensional standard and size, schedule or wall or class, pressure class and facing where applicable, conditions, certification, quantity, delivery point and date.
Request a Quotation
Send the line list or material take-off rather than a product category. Pricing a list is faster than answering a browse, and it catches the mismatches between pipe, fitting and flange before they reach a weld.